Site Plan

SITE PLAN

• Parameters: 7,600 SF lot (.18 acres), 22’ grade change from street to rear, infill development.

• All storm water runoff collected on site (intensive green roof, underground cistern, “water table” under vegetable garden, rain barrels, rain gardens).

• Hardscape is minimized and pervious (bioswale between paver tire tracks, CalStar (low embodied energy and flyash) driveway and terrace pavers.

• Permanent erosion control with retaining walls built from repurposed foundation stone from a demolished elementary school.

• All landscaping is native and drought tolerant

• Turf is limited to rear yard and is native drought tolerant Buffalo Grass.

• Main underground cistern is sized for and piped to main house for future connection to service grey water use in the house (grey water against County Building Code currently).

• 100% hardscape and all roofs (except green roof) are light colored high albedo materials.

• Massing: 2 axes – south light and street frontage. Front volume is 1.5 stories to contextually blend with neighborhood. Rear volume cornered to south light to distribute light among living spaces.

• Gross SF: 3,500 sf

• Net SF: 2,950 sf.

• Program: family of 4 with young children, grandparents, and office space for business.